picture4

Kambah DPF Irrigation

Value: $900k

Overview

ABACM were engaged to Project Manage the Kambah Irrigation Upgrades, which involved upgrading the entire irrigation system for seven fields around Canberra.

The upgrades incorporate the following works:
• Upgrade Kambah Irrigation system by laying new mainline and laterals as per the specifications to ensure a long term operational system.
• Capping of the existing PVC Mainline
• Install sprinkler heads on all fields


Completed 2014

Scroll to Top