Dickson 50M Pool Restoration
Value: $2.3 million
Overview
Design new wet deck gutter system and retile entire 50 metre pool. Repair leaking sluice valve in main pit and backwash valve to prevent water loss.
•Retile entire 50 metre pool
•Install new wet deck gutter system to 50 metre pool
•Replace backwash valve & sluice valve
•Remove and replace all concrete pavement primarily at 50 metre concourse and slash park areas
•Replace defective sewer drainage to rest/change rooms
•Filtration pipe work upgrades stage 1 and 2
Designed and constructed a new accessible complaint ramp into the 50m pool to allow mobility restricted persons to access the shallow end
Completed 2022