picture1

Nicholls Synthetic

Value: $1.7 million

Overview

The scope for the project included , Removal of the existing synthetic grass.
Site preparation to ensure gradients, drainage, and the specified surface standards required for laying synthetic grass.
Installing shock pad, turf and SBR infill to the standard requirements. Install posts, line marking and other ancillary works

The quality requirements to achieve FIFA accreditation were achieved by ABACM. Safety management was at the fore front as the site was adjoining two schools, ABACM successfully managed the project without incident or disruption to students.


Completed 2019